Skip to main content
Guildford Borough Council

Proposed Submission Local Plan: strategy and sites 2016

Proposed Submission Local Plan: strategy and sites 2016 - Part 2: Sites

A30: Land for new bridge A323 at Ash railway station

 

POLICY A30: Land for new road bridge and footbridge scheme to enable level crossing closure on A323 Guildford Road adjacent to Ash railway station, Ash

Allocation

This site is allocated for a new road bridge and footbridge to enable the closure of the level crossing on the A323 Guildford Road, adjacent to Ash railway station

Requirements

  • Site to be used for a new road bridge and footbridge to enable the closure of the level crossing on the A323 Guildford Road, adjacent to Ash railway station, as per Appendix C Infrastructure Schedule
  • Existing accesses to be maintained where necessary
  • Appropriate re-provision of four Traveller pitches (sui generis)

 

Description

Location

Urban area

Ward

Ash South and Tongham

Ownership

Private

Area (size)

2.7 ha

Existing use

Fields and four permanent traveller pitches (sui generis)

LAA reference

N/A

Key considerations

  • Height and layout of road bridge and footbridge
  • Loss of traveller pitches

A30 Land for new road bridge and footbridge scheme to enable level crossing closure on A323 Guildford Road adjacent to Ash railway station, Ash 

Click image to enlarge